Posted by Vaughn [172.69.140.162] on Thursday, November 30, 2023 at 18:23:05 :
The engine is now setting on its mounts in the frame, no support. Carb sets well, and clearance between dist. and cowl is good. The only thing left to do is wire the screws and torque the 4 engine screws to finish it off. Plenty of clearance for the water inlet hose and the engine is solid as a rock, no flexing. Now for the next phase, modifying the radiator shroud and attaching miscellaneous engine items. I�m very pleased with how it�s turning out.
Follow Ups: