Posted by Gil in Spokane [67.185.42.254] on Tuesday, January 25, 2011 at 00:54:07 :
In Reply to: OT possible summer rigging project posted by David Sherman [72.47.9.228] on Monday, January 24, 2011 at 23:36:55 :
Maybe keep the winch at the bottom and run an endless cable on it through a block at the top - no worry about storing cable on the drum and you can haul stuff up on either line while the other is coming back down. Don't have to get the winch / donkey to the top. Don't have to haul the line back out each time.
Follow Ups: