Posted by Franz [209.86.226.20] on Tuesday, January 25, 2011 at 03:21:56 :
In Reply to: Re: OT possible summer rigging project posted by David Sherman [72.47.9.228] on Tuesday, January 25, 2011 at 03:12:57 :
To do it with any degree of safety will require 2 people, one top and one bottom.
The endless line will save a lot of headaches, run it between a spar on both top and bottom and use a takeup line at the winch end to run the endless up and down the spar on one end to raise and lower the load.
Follow Ups: