Posted by Dave Horvath [162.158.79.248] on Wednesday, April 19, 2017 at 19:50:24 :
John S built this one for me. NPT end welded to threaded shaft with nut welded on end. Slip the pipe over the shaft. Insert the NPT end into the spring pin. Tighten the loose nut. Shown here with two sizes of pipe. Larger pipe is for VF spring pins.
Follow Ups: