Re: winter concrete..


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by John Eickhof [108.162.244.85] on Saturday, January 02, 2016 at 17:57:19 :

In Reply to: Re: winter posted by Willy-N [108.162.216.23] on Saturday, January 02, 2016 at 13:30:23 :

Why not? I delivered 30+ yards this week in sub zero conditions, we pour all winter long just a matter of proper tools and technique, ie ground warmers, heaters, hot water and chemicals in the mix and proper post pour proceedures, the toughest part for me as a mixer driver is de-icing myself after washing down after the pour! The fun part is navigating around the job in 6 wheel drive in a 35 ton Oshkosh pouring the mud!!



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com