Posted by Rob in Paso Robles [108.219.11.20] on Monday, April 29, 2013 at 10:34:52 :
Here is some more progress. Cab is finally on. Half of the brake and fuel lines are in place. Fitting hydroboost brake master cylinder along with the clutch master cylinder. Hooking up steering: steering box is from a scout II, ordering crossover steering soon for the Dana 60. It is coming together just need the time to work on it. Should be running for Hollister.
Follow Ups: