Re: OT Pole Building Help


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by hemimech [174.252.227.37] on Friday, January 28, 2011 at 11:52:15 :

In Reply to: OT Pole Building Help posted by Dave In Yakima [68.186.91.64] on Friday, January 28, 2011 at 10:50:12 :

Have you considered using a Sonotube footing form? 12-16" dia. Set them at the proper height and location with at string line. At the time of the concrete pour all you have to worry about is setting in and locating the metal post anchor brackets. This way leveling of the posts can be done at your convenience.



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com