Posted by Kaegi [71.227.129.92] on Tuesday, January 18, 2011 at 21:52:19 :
In Reply to: Re: steve what you up to now posted by clueless [201.202.24.94] on Tuesday, January 18, 2011 at 17:57:52 :
it was a fun project getting this fun house back to normal. 75% of the house had sank as much as 7.5 inches. IT happened shortly after it was built in the 40s and they came in and put concrete pilings on the down hill side. the hill was giving way and the back yeard was lost and house sank. so they did the pilings but never levelled the house. it looked as is one attempt was made to kinda level it out but I think alcohol was involved. ;/) now it is all within 1/4 inch. And I added more pilings. on one corner and for good measurer am going to pound in some more in the spring. here it is when still on the jacks.