Posted by Will (in IL) [98.214.244.154] on Thursday, August 27, 2009 at 20:31:14 :
The bearings from Alex Nash at Nash Lift Truck Supply Company this afternoon, so I can start working on the front Differential. It's completely gutted, but still needs some cleaning. As soon as I have the front wheels back on, I plan on pulling the truck out for a degreaseing and removing the bed (replacing it anyway) from the back, this should help in the rear brake/fuel tank work.
It's amazing how a simple job of installing a set of Disc Brakes on the front has snow-balled! At this point I'll probably pull the radiator and get the leak fixed while I'm at it.
Will
Follow Ups: