1/2 ton wc bedside reproduction.


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by jim on Monday, September 12, 2005 at 3:40PM :

I got a quote today from a larger metal fabrication place here in Cincinnati today to breake the metal bedsides for the wc 1/2 ton. the price was 150 per side. the only two catches were that the price does not include the roll on top and I have to drill all of the holes. Has anyone out there have sucess in welding a pipe to the top and have it look good.


jim



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com