Posted by Gene on Monday, December 29, 2003 at 12:24PM :
In Reply to: Re: 66 W200 posted by Ken C. on Monday, December 29, 2003 at 8:37AM :
Ken, the system is 1/2" plastic pipe run 2' on center through the whole floor, devided into 3 different zones( maximun length of 125'per run )I will be using a 40 gallon power vented water heater for the boiler and a pump and manifold. If you do all the work your self you could probably get by for under $2500. Gene