Posted by MikeC [207.182.200.195] on Tuesday, July 21, 2015 at 08:47:32 :
In Reply to: Bridge passed inspection recently .... posted by Power Wagon Transport [75.66.196.196] on Monday, July 20, 2015 at 16:15:26 :
The March inspection has nothing to do with the flash flood that undermined and took out the bridge. It was perfectly safe until the flood waters took it out-the bridge was never designed to withstand that level of flash flooding.
Follow Ups: