Got my Drive Shaft Back,Took a while? Pict


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by Willy-N [72.171.192.121] on Saturday, June 27, 2015 at 01:38:49 :

Worth the wait it is like a mirror finish and they replaced the tube with a new proper one not reduced and welded up. I also got my re-bushed Clutch Pedal assembly. Waiting on the PTO Shifter Casting to be welded up. I can put the drive shaft in tomorrow and the pedal assembly for something else to do. No 4th of July Parade Run for the 6X6 this year unless I do it with out the cab on. But it will be ready for my birthday in October!



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com