Posted by dave horvath [24.131.120.209] on Friday, March 25, 2011 at 22:01:30 :
Well the barn is ready for Rob Blair to install the radiant heat flooring and new siding to be hung. We cleared out the barn, removed the rotted wooden siding, framed for insulation and steel siding, relocated the ramp to the second floor, re-routed the electric, installed a door, and moved a whole lot of dirt and gravel. Big thanks to Tim Holloway, Joel Folman, Keith Wolfe, John S. and John W.S., etc. More insulating and siding to do yet. It may not look like much, but this will be a great place to store the trucks and tractor and work on things out of the rain and snow. Pictures of progress at www.imageevent.com/dad2nick/
Follow Ups: