Re: OT possible summer rigging project


[Follow Ups] [Post Followup] [Dodge Power Wagon Forum]


Posted by David Sherman [72.47.9.228] on Tuesday, January 25, 2011 at 03:12:57 :

In Reply to: Re: OT possible summer rigging project posted by Gil in Spokane [67.185.42.254] on Tuesday, January 25, 2011 at 00:54:07 :

Good point about the haul-back line. I had forgotten about that, though if I have to go down the hill anyway to hitch up the next load, it might not be too hard to pull the sled or bucket down behind me. At a 40% grade, it might be hard to STOP it from coming down too fast behind me.



Follow Ups:



Post a Followup

Name:
E-Mail:
Subject:
Message:
Optional Link
URL:
Title:
Optional Image Link
URL:


This board is powered by the Mr. Fong Device from Cyberarmy.com