Posted by Doug in Sausalito on Saturday, July 19, 2003 at 6:20PM :
My "heap" is ready for the Frame shop in Berkley on Tuesday. The frame was bent in the front by a tree crane that was mounted on the front bumper and bed.
After 8 months of body and engine work I will be taking the Wagon to my buddys paints shop. I am going to paint it with Awlgrip Marine two part polyurethane paint from West Marine.
I am at $14,000 and counting. This is double what I thought it would be. The "heap" runs and drives well at least.
Follow Ups: